Corrosion deposits inside this ageing hilltop main had reduced its internal diameter by up to 30%. The park above had to stay open to the public, so every pit and laydown area was kept compact and fenced off from the footpaths.
Cleaning took several stages: swabbing, scraping, rodding, abrasive cleaning and water jetting, each checked by robotic CCTV. A hybrid liner with a long-working-time resin was then pulled in through the access pits and steam-cured in place, with mechanical end seals at each termination.
The result is a structural lining designed for a 50-year life, with very little excavation in a sensitive green space.



Figures are taken from the project records. Client and site names are withheld.