This main ran beneath a busy residential courtyard, a car park and a supermarket loading area, and passed under a drain and a road. Its route had numerous bends, diameter transitions and branch connections, all of which had to stay in service.
We used CIPP for the straighter runs and spray-in-place lining for the bends, transitions and offtakes, all worked from temporary access pits. A hole-spanning test was also carried out: a 9 mm spray lining over a 50 mm hole held 10 bar for 24 hours.
Using both methods meant each part of the pipe got the lining that suited it, and residents and businesses kept their access throughout.


Figures are taken from the project records. Client and site names are withheld.