Large trunk sewers carry flow that cannot simply be switched off. On this 10 km project in Singapore, the sewers range from 600 mm to 2.2 m in diameter, and they stay in service while we line them.
A PVC profile strip is fed from a drum at ground level, down the manhole to a winding machine. The machine spirals the strip and locks each turn to the one before it, forming a new pipe that advances along the old sewer. Steel reinforcement is wound in with the profile.
Because the liner is formed in place, the sewer keeps flowing during installation. The liner ends are finished at the manholes, and every lined length is checked by CCTV.






Figures are taken from the project records. Client and site names are withheld.