Two weeks, one shutdown: relining pipework inside a working waterworks

More than 50 m of corroded DN450 and DN600 pipe renewed without stopping the plant.

The same pipe before cleaning and after lining.
The same pipe before cleaning and after lining.
Pipe
DN450 and DN600
Length
More than 50 m
Method
CIPP, pull-in-place
Programme
Two weeks

Years of corrosion had left the plant's pipework heavily encrusted. The pipes ran in short sections of 5 to 12 m, between existing equipment, with confined-space access and a fixed shutdown window.

We surveyed each section with a robotic crawler, cut the scale back with a chain cutter and finished with high-pressure jetting. Overlapping liner sections were then pulled in place, so the lining runs continuously from one section to the next.

Post-lining CCTV showed smooth transitions at every overlap, and pressure testing confirmed the lining was watertight. The lined pipes were back in service within 24 hours of lining, and the plant kept running throughout.

Robotic crawler entering the pipe for the pre-lining survey.
Robotic crawler entering the pipe for the pre-lining survey.
Lined pipework reconnected and ready to return to service.
Lined pipework reconnected and ready to return to service.

Figures are taken from the project records. Client and site names are withheld.

Contact

Tell us about your pipeline.

Share the location, pipe size and material, length and the problem you are seeing. We will reply with next steps.

Coimbatore office
12B, Door No. 1996/7A, MR Garden
Narayana Avenue, Krishna Colony
Coimbatore, Tamil Nadu 641015, India

Your enquiry is sent directly to our office. We will reply by email.