Fire-water lines must keep their high operating pressure. The site allowed only short shutdowns, restricted access and strict operating rules.
Each package had its own liner design. Material and thickness were checked against the pipe size and operating pressure for a 50-year design life. Deliveries, installation and staged reinstatement were planned with the client package by package.
Package by package, more than 3 km of fire-water main has been renewed without open-cut trenching.
Figures are taken from the project records. Client and site names are withheld.