Two runs of 123 m and 187 m were thick with debris and hard scale, which hid the pipe wall and the connections.
A pre-condition CCTV survey set the cleaning plan. Mechanical tools removed the scale, and flushing recovered the loose material from the pipe and pits. Each section was then re-inspected and measured before it was released for lining.
Both sections were renewed internally along their existing route, with very little excavation.


Figures are taken from the project records. Client and site names are withheld.