Overview
New lines are easiest to put right before they go into service. CCTV at handover records the condition of joints, gradients and pipe walls, and a second survey before the end of the defects liability period confirms nothing has changed.
We report in the format your consultant or authority requires, so the record can go straight into the acceptance submission.
How it works
- 01
Clean
Line cleared of construction debris.
- 02
Survey
Full-length CCTV with distance and inclination.
- 03
Check
Joints, deflection and damage logged against specification.
- 04
Submit
Report and footage issued for acceptance.
Applications
- Developer and contractor handover
- Pipe-jacking and microtunnelling drives
- End-of-DLP inspections
- Disputed defect investigations