The owner wanted a clear record of the main before planned works, so that any later inspection would have a baseline to compare against.
We deployed through the air-valve access once the clear opening was confirmed, and surveyed upstream along the agreed route. Every significant observation was logged against its distance along the main.
The footage showed possible leak points and trapped air, as well as the condition of the pipe wall, all without interrupting supply.

Figures are taken from the project records. Client and site names are withheld.