Overview
Where a line cannot be lined under flow, we divert it around the work area by overpumping. The arrangement is planned with the asset owner so that service continues while the pipe is out of use.
Pump sizing, standby capacity and monitoring are set for the flows expected during the works.
How it works
- 01
Plan
Flows and route agreed with the asset owner.
- 02
Install
Pumps, plugs and temporary lines set up.
- 03
Monitor
Levels watched throughout the works.
- 04
Restore
Flow returned and equipment removed.
Applications
- CIPP and point repair
- Manhole rehabilitation
- Emergency repairs